SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sludge Treatment Project Engineered Container Retrieval and Transfer System January 2012<br />

1.5 DEF<strong>IN</strong>ITIONS<br />

A. Refer to Section 011100, Summary of Work, for definition of general requirements that apply to<br />

all specification sections prepared for this Project.<br />

B. Specific definition applicable to this section include:<br />

1. Buyer: the contractor responsible for managing the design, procurement, and construction<br />

of the K-West Basin Modification Annex Project.<br />

2. Seller: Contracted fabricator, vendor, or subcontractor performing work to the contract<br />

drawings, data sheets, and technical specifications.<br />

3. Certificate of Conformance: A document signed or otherwise authenticated by an authorized<br />

individual certifying the degree to which items or services meet specified requirements.<br />

4. Certified Test Report (CTR): A written signed document, approved by qualified personnel<br />

that contains sufficient data and information to verify the actual properties of items<br />

and the actual results of all required tests.<br />

5. Certified Weld Inspector (CWI): Personnel performing visual examination of welds certified<br />

per the employers written practice in accordance with ASNT-TC-1A.<br />

6. High-Pressure Compressed-Air Piping: System of compressed-air piping and specialties<br />

operating at pressures between 100 and 125 psig, located between the system air compressor<br />

and the system air dryer.<br />

7. Instrument Air Piping: System of instrument-air piping and specialties operating at pressures<br />

of 125 psig or less and located downstream of the system air dryer.<br />

8. MSDS: Material Safety Data Sheet<br />

9. Performance Qualification Test (PQT): Standard performance test(s) which a Welder<br />

shall successfully pass in order to be qualified to weld. The requirements for these tests<br />

are based on a qualified Welding Procedure Specification and establish a specific range<br />

of essential variables the Welder is qualified for.<br />

10. Pressure, Leak Test: The static pressure, acting in the direction of the operating pressure<br />

(positive or negative), used for establishing leakage rates. This pressure usually exceeds<br />

the maximum operating pressure of the item being tested, but does not exceed structural<br />

capability pressure.<br />

11. Procedure Qualification Record (PQR): Written documentation of the qualification of a<br />

Welding Procedure Specification by examination and testing of physical weld specimens<br />

made using the Welding Procedure Specification<br />

12. Storage (Holding) Ovens: Vented and temperature controlled ovens in which welding filler<br />

materials are stored after opening the manufacturer-supplied container<br />

Contract 44577 KW Annex – Rev. E 44577-CSI-SPEC-001 221513 - 7