01.10.2013 Views

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sludge Treatment Project Engineered Container Retrieval and Transfer System December 2011<br />

<strong>SECTION</strong> 321216 - ASPHALT PAV<strong>IN</strong>G<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section Includes:<br />

1. Hot-mix asphalt paving.<br />

B. Related Sections:<br />

1. Division 31 Section “Earth Moving” for aggregate subbase and base courses and for<br />

aggregate pavement shoulders.<br />

1.2 SUBMITTALS<br />

A. Product Data: For each type of product indicated. Include technical data and tested physical<br />

and performance properties.<br />

1. Job-Mix Designs: Certification, by authorities having jurisdiction, of approval of each<br />

job mix proposed for the Work.<br />

2. Job-Mix Designs: For each job mix proposed for the Work.<br />

3. Herbicide product information and application recommendations.<br />

4. Material Certificates: For each paving material, from manufacturer.<br />

B. Testing Agency Qualifications<br />

C. Field quality control reports.<br />

1. Batch ticket from each truck delivery showing conformance to the approved job mix.<br />

2. Temperature records for ambient, subgrade and paving material taken in field.<br />

3. In place material compaction test reports.<br />

1.3 QUALITY ASSURANCE<br />

A. Manufacturer Qualifications: A paving-mix manufacturer registered with WSDOT and<br />

approved by Buyer’s Technical Representative.<br />

B. Regulatory Requirements: Comply with materials, workmanship, and other applicable<br />

requirements of 2010 Standard Specification M41-10 of WSDOT for asphalt paving work.<br />

1. Measurement and payment provisions and safety program submittals included in<br />

WSDOT standard specifications; do not apply to this Section.<br />

2. Requirements set forth in this specification shall govern over requirements of WSDOT<br />

specifications.<br />

C. Preinstallation Conference: Conduct conference at Project site.<br />

Contract 44577 KW Annex - Rev. D 44577-CSI-SPEC-001 321216 - 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!