Sludge Treatment Project Engineered Container Retrieval and Transfer System January 2012<br />

3.3 COLD BEND<strong>IN</strong>G OF PIPE OR TUBE<br />

A. Fabricate pipe or tube bends in accordance with TPA-CBS-98.<br />

B. Fabricator shall submit a detailed procedure for bending, specifying method used, inspection,<br />

wall thickness measurement, and documentation.<br />

C. The pipe or tube material to be cold bent shall comply with the specific piping class requirements.<br />

For production bending, the fabricator may select the next higher schedule to offset anticipated<br />

thinning as approved by the Buyer. Bending is restricted to bends having a minimum center-line<br />

bend radius of 3 times the pipe nominal outside diameter.<br />

D. Lubricants used for bending operations must be free of halogens, sulfur, and low-melting-point<br />

metals.<br />

E. Qualification Testing<br />

1. Before any production bending is done, the following bend qualification testing shall be<br />

done by the Fabricator as required by Purchase Order.<br />

2. Stainless Steel — Following cold bending, samples shall be taken from Intrado and Extrado<br />

for Stress-Corrosion Testing in accordance with ASTM G 123.<br />

3. Before any testing is to commence, the Fabricator shall present a detailed test procedure<br />

to the Buyer for review and approval.<br />

3.4 VALVE <strong>IN</strong>STALLATION<br />

A. Provide access where valves and other equipment are not exposed.<br />

B. Install valves with stems upright or horizontal, not inverted.<br />

C. Install the valve actuator and valve stem extensions in accordance with the drawings and<br />

manufacturer’s instructions.<br />

D. Install check valves to maintain correct direction of flow as indicated on the system P&IDs.<br />

E. Install pressure regulators on piping where reduced pressure is required.<br />

F. Install pressure relief valve and full-size discharge piping to designated drains.<br />

3.5 HANGER AND SUPPORT <strong>IN</strong>STALLATION<br />

A. Comply with requirements in Section 220548, Vibration and Seismic Controls for Plumbing<br />

Piping and Equipment, for seismic-restraint devices.<br />

Contract 44577 KW Annex - Rev. E 44577-CSI-SPEC-001 431510 - 23