Sludge Treatment Project Engineered Container Retrieval and Transfer System December 2011<br />

1.5 QUALITY ASSURANCE<br />

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70,<br />

by a qualified testing agency, and marked for intended location and application.<br />

B. Comply with NFPA 70.<br />

1.6 DELIVERY, STORAGE, AND HANDL<strong>IN</strong>G<br />

A. Store, protect, and handle all radiation instrumentation according to manufacturer’s instructions.<br />

1.7 PROJECT CONDITIONS<br />

A. Do not deliver or install equipment until spaces are enclosed and weathertight, wet work in<br />

spaces is complete and dry, work above equipment is complete, and temporary HVAC system is<br />

operating and maintaining ambient temperature and humidity conditions at occupancy levels<br />

during the remainder of the construction period.<br />

1.8 COORD<strong>IN</strong>ATION<br />

A. Coordinate layout and installation of radiation detection equipment with other construction,<br />

including electrical and other types of equipment, raceways, piping, encumbrances to<br />

workspace clearance requirements, and adjacent surfaces. Maintain required workspace<br />

clearances and required clearances for equipment access doors and panels.<br />

PART 2 - PRODUCTS<br />

2.1 MANUFACTURERS<br />

A. GFE Equipment: Eberline/Thermo<br />

1. Alpha Continuous Air Monitors: Alpha 6A-1<br />

2. Beta Continuous Air Monitors: AMS-4<br />

3. Area Radiation Monitors: Alpha EC4-X<br />

4. Personnel Contamination Monitor: APCM-2 Half Body Counter<br />

5. Hand and Foot Monitor: HFM-6<br />

PART 3 - EXECUTION<br />

3.1 <strong>IN</strong>STALLATION<br />

A. Install radiation detection equipment and accessories according to manufacturer’s instructions.<br />

B. Comply with mounting and anchoring requirements specified in Division 26 Section "Vibration<br />

and Seismic Controls for Electrical Systems.”<br />

Contract 44577 KW Annex – Rev. D 44577-CSI-SPEC-001 283233 - 2