01.10.2013 Views

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sludge Treatment Project Engineered Container Retrieval and Transfer System January 2012<br />

<strong>SECTION</strong> 221329 - SANITARY SEWERAGE PUMPS (FIRE WATER DRA<strong>IN</strong>AGE LIFT STATION)<br />

PART 1 - GENERAL<br />

1.1 RELATED DOCUMENTS<br />

A. Drawings and general provisions of the Contract, including General and Supplementary<br />

Conditions and Division 01 Specification Sections, apply to this Section.<br />

1.2 SUMMARY<br />

A. PRE-PACKAGED LIFT STATION: Provide a Compete UL Listed, Duplex Alternating, Pre-<br />

Packaged Sewage Lift Station. Package shall include, Fiberglass Wet Well / Valve Vault,<br />

submersible quick-disconnect Pumps, Controls, Piping, Valves and all other Appurtenances as<br />

described in the following specifications.<br />

B. Related Sections include the following:<br />

1. Division 22 Section "Facility Storm Drainage Piping (Fire Water Drainage)."<br />

1.3 SUBMITTALS<br />

A. Product Data: For each type and size of sewage pump specified. Include certified performance<br />

curves with operating points plotted on curves; and rated capacities of selected models,<br />

furnished specialties, and accessories.<br />

B. Shop Drawings: Diagram power, signal, and control wiring.<br />

C. Operation and Maintenance Data: For each sewage pump to include in emergency, operation,<br />

and maintenance manuals.<br />

1.4 QUALITY ASSURANCE<br />

A. Product Options: Drawings indicate size, profiles, and dimensional requirements of sewage<br />

pumps and are based on the specific system indicated. Refer to Division 01 Section "Product<br />

Substitution Procedures."<br />

B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70,<br />

Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for<br />

intended use.<br />

1.5 DELIVERY, STORAGE, AND HANDL<strong>IN</strong>G<br />

A. Retain shipping flange protective covers and protective coatings during storage.<br />

Contract 44577 KW Annex – Rev. E 44577-CSI-SPEC-001 221329-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!