Sludge Treatment Project Engineered Container Retrieval and Transfer System January 2012<br />

1.7 PROJECT CONDITIONS<br />

A. Facility conditions<br />

1. Equipment that is to be located indoors will be in a temperature controlled industrial type<br />

location.<br />

2. Facility interior ambient conditions are 65 to 80 °F.<br />

3. Facility exterior ambient conditions are -27 to 110 °F.<br />

4. Facility elevation is 660 ft above mean sea level.<br />

B. Interruption of Existing Service(s): Do not interrupt services to facilities occupied by the Buyer or<br />

others unless permitted under the following conditions and then only after arranging to provide<br />

temporary service according to requirements indicated:<br />

1. Notify Buyer no fewer than two days in advance of proposed interruption of facility<br />

service(s).<br />

2. Do not proceed with interruption of facility service(s) without Buyer's written<br />

permission.<br />

1.8 COORD<strong>IN</strong>ATION<br />

A. Coordinate interfacing service connections with other service connections.<br />

1. Process systems service connections are specified in Section 011100, Summary of Work.<br />

2. Electrical power connections (if required) are specified in Section 260519, Low-Voltage<br />

Electrical Power Conductors and Cables.<br />

1.9 EXTRA MATERIALS<br />

A. Furnish extra materials described below that match products installed and that are packaged with<br />

protective covering for storage and identified with labels describing contents.<br />

1. One set of tools required for installation and maintenance.<br />

1.10 DELIVERY, STORAGE AND HANDL<strong>IN</strong>G<br />

A. See Section 016600, Material and Equipment Storage, and Handling, for general delivery storage<br />

and handling requirements.<br />

B. Individual pipe spools that are delivered to the fabrication site shall be cleaned in accordance with<br />

Part 3.1.A and capped with chloride/halogen free plastic caps.<br />

C. Pipe spools shall be labeled with the full fill line numbers in accordance with Section 220553,<br />

Identification for Plumbing Piping and Equipment.<br />

Contract 44577 KW Annex - Rev. E 44577-CSI-SPEC-001 431510 - 9