Sludge Treatment Project Engineered Container Retrieval and Transfer System January 2012<br />

5. Elastomeric flexible hose (larger than 1”)<br />

6. Ball valves.<br />

7. Check valves.<br />

8. Needle valves.<br />

9. Safety valves (ECRT-PSV-601 and ECRT-PSV-611).<br />

10. Pressure control valves.<br />

11. Flow orifices (ECRT-FO-601 and ECRT-FO-602).<br />

12. Quick couplings.<br />

13. Compressed gas manifold.<br />

14. Compressed gas cylinder safety caps.<br />

15. Compressed gas cylinder storage racks.<br />

16. Welding materials.<br />

17. Fasteners.<br />

18. Joining materials.<br />

C. Fabrication Drawings: Piping Isometrics, Plans and Elevations.<br />

D. Piping Material Certification: Signed by Seller certifying that piping materials comply with<br />

ASME B31.3 requirements.<br />

E. Certificates of Shop Inspection and Data Report for piping: As required by ASME B31.3 and that<br />

the piping has been designed, manufactured and constructed in accordance with the Seller’s QA<br />

plan.<br />

F. Weld Inspection Reports<br />

The Seller shall prepare and submit weld Inspection reports that include the following information:<br />

1. Weld Map identifying weld numbers showing relative positions of pressure containing<br />

welds and attachment welds to pressure retaining components; do not reuse weld numbers.<br />

If a weld is completely replaced, assign a new number,<br />

2. Weld procedures utilized,<br />

3. Procedure qualification records (PQR) number,<br />

Contract 44577 KW Annex - Rev. E 44577-CSI-SPEC-001 226313 - 3