Sludge Treatment Project Engineered Container Retrieval and Transfer System January 2012<br />

8. Closed copies of Non-Conformance Reports (NCRs) dispositioned accept–as-is, repair,<br />

reject or rework.<br />

9. Critical dimension verification for external interfaces.<br />

10. Bending procedures and bend qualification records.<br />

11. Calibration reports.<br />

12. Certificates of calibration.<br />

13. Fastener torque completion reports.<br />

14. Field quality-control test reports.<br />

15. Commercial Grade Item (CGI) dedication packages (if required by the Statement of<br />

Work).<br />

1.4 QUALITY ASSURANCE<br />

A. Work identified in this section shall be done under a Quality Assurance program in accordance<br />

with ASME NQA-1, as approved by the Owner and described in Section 014000, Quality<br />

Assurance and Control.<br />

B. The highest functional classification for the scope of this Specification section is classified as<br />

Safety Significant.<br />

C. Quality levels are defined on the associated line lists, valve lists and datasheets accompanying this<br />

section.<br />

D. Welding/Brazing: Qualify processes and operators according to ASME Boiler and Pressure<br />

Vessel Code: Section IX, "Welding and Brazing Qualifications" or AWS B2.2/B2.1M, "Standard<br />

for Brazing Procedure and Performance Qualification."<br />

E. Comply with provisions in ASME B31 Series, "Code for Pressure Piping."<br />

F. Certify that each welder has passed AWS qualification tests for welding processes involved and<br />

that certification is current.<br />

G. Examination Requirements for ASME B31.3, Pipe Welding:<br />

1. Perform a visual examination of the weld joint fit-up of welds (the 5% specified by<br />

ASME B31.3) to assure, at a minimum, that markings and certifications of base materials<br />

and filler materials are in accordance with specified requirements, the base metals are of<br />

specified thicknesses and types, materials are free from contaminants, fit-up meets the<br />

joint detail for the welding procedure specification, the weld purge is set up properly and<br />

exit gas is being analyzed, and the welder is qualified to make the weld.<br />

Contract 44577 KW Annex - Rev. E 44577-CSI-SPEC-001 431510 - 4