Sludge Treatment Project Engineered Container Retrieval and Transfer System January 2012<br />

3.10 PIPE CODES<br />

PIP<strong>IN</strong>G CODE: P-2 Fire Water Drain Piping (Gravity)<br />

Design Pressure 10 foot head of water<br />

Test Pressure 10-foot head of water<br />

Operating Temperature<br />

Inspection and Test<br />

Method<br />

Sizes 12” Pipe and smaller<br />

Tubing/Pipe<br />

Fittings<br />

Valves As shown on Drawings.<br />

Environmental Extremes: -27°F to 110°F<br />

Normal Operating Extremes: 30°F to 80°F (Note 1)<br />

Visual Examination<br />

Hydrostatic testing at 10 foot of head water for all tubing and piping<br />

Solid Wall PVC Pipe: Schedule 40 PVC, ASTM D 2665, drain, waste, and<br />

vent piping solvent joints.<br />

PVC Socket fittings: ASTM D 2665, made to ASMT D 3311, drain, waste,<br />

and vent patterns and to fit schedule 40 pipe.<br />

Note:<br />

1) Based on 30°F winter and 80°F summer approximate ground temperature.<br />

2) Standards referenced above shall be used unless approved by buyer.<br />

Contract 44577 KW Annex - Rev. E 44577-CSI-SPEC-001 221413 - 12