Sludge Treatment Project Engineered Container Retrieval and Transfer System December 2011<br />

2. Assist in field testing of equipment.<br />

3. Report results in writing.<br />

C. Perform the following field tests and inspections and prepare test reports:<br />

1. Perform each electrical test and visual and mechanical inspection, except optional tests,<br />

stated in NETA ATS “ Motor Control – Motor Starters.” Certify compliance with test<br />

parameters.<br />

2. Correct malfunctioning units on-site, where possible, and retest to demonstrate<br />

compliance; otherwise, replace with new units and retest.<br />

3.8 ADJUST<strong>IN</strong>G<br />

A. Set field-adjustable switches and trip ranges.<br />

END OF <strong>SECTION</strong> 262913<br />

Contract 44577 KW Annex – Rev. D 44577-CSI-SPEC-001 262913 - 6