01.10.2013 Views

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sludge Treatment Project Engineered Container Retrieval and Transfer System December 2011<br />

1. TIA/EIA-568-B.1 requires that a minimum of two telecommunications outlet/connectors<br />

be installed for each work area.<br />

B. A work area is approximately 100 sq. ft., and includes the components that extend from the<br />

telecommunications outlet/connectors to the station equipment.<br />

C. The maximum allowable horizontal cable length is 295 feet. This maximum allowable length<br />

does not include an allowance for the length of 16 feet to the workstation equipment. The<br />

maximum allowable length does not include an allowance for the length of 16 feet in the<br />

horizontal cross-connect.<br />

1.5 SUBMITTALS<br />

A. Product Data: For each type of product indicated.<br />

1.6 QUALITY ASSURANCE<br />

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70,<br />

by a qualified testing agency, and marked for intended location and application.<br />

B. Telecommunications Pathways and Spaces: Comply with TIA/EIA-569-A.<br />

C. Grounding: Comply with ANSI-J-STD-607-A.<br />

1.7 COORD<strong>IN</strong>ATION<br />

A. Coordinate layout and installation of telecommunications pathways with structural members,<br />

HVAC, plumbing items, and architectural features in the paths with common supports.<br />

B. Coordinate telecommunications outlet/connector locations with location of power receptacles at<br />

each work area.<br />

PART 2 - PRODUCTS<br />

2.1 PATHWAYS<br />

A. General Requirements: Comply with TIA/EIA-569-A.<br />

B. Cable Trays: Comply with requirements in Division 26 Section "Cable Trays for Electrical<br />

Systems."<br />

C. Conduit and Boxes: Comply with requirements in Division 26 Section "Raceway and Boxes for<br />

Electrical Systems."<br />

1. Conduits to end devices shall be 1 inch minimum trade size.<br />

2. Conduit sections between pull points shall be no greater than 100 feet in length.<br />

3. Use 4 inch square minimum size outlet boxes for pull points, rather than conduit bodies.<br />

Contract 44577 KW Annex – Rev. D 44577-CSI-SPEC-001 271500 - 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!