Sludge Treatment Project Engineered Container Retrieval and Transfer System December 2011<br />

ceeded<br />

Hardware Points Software Points<br />

Point Name AI AO BI BO AV BV Sched Trend Alarm<br />

Boiler Failure ×<br />

Boiler Running in Hand ×<br />

Boiler Runtime Exceeded ×<br />

High Primary Hot Water Supply<br />

Temp<br />

Low Primary Hot Water Supply<br />

Temp<br />

1.12 ECRT-P-501<br />

Show On<br />

Graphic<br />

Totals 2 0 4 2 1 0 0 7 10 9<br />

Total Hardware ( 8 ) Total Software ( 18 )<br />

A. Hydronic Water Pump System - Run Conditions:<br />

1. The Hydronic water pump shall be enabled whenever:<br />

a. A definable number of glycol water coils need cooling or heating.<br />

b. AND the outside air temperature is greater than 55°F (adj.) or less than 50°F (adj.).<br />

2. To prevent short cycling, the hydronic water pump system shall run for and be off for<br />

minimum adjustable times (both user definable).<br />

B. Hydronic Water Pump:<br />

1. The hydronic water pump shall run anytime it is requested to run.<br />

C. The hydronic water pump shall have:<br />

1. A user adjustable delay on start.<br />

2. AND a user adjustable delay on stop.<br />

3. The delay times shall be set appropriately to allow for orderly hydronic water system<br />

start-up, shutdown and sequencing.<br />

D. Alarms shall be provided as follows:<br />

1. Hydronic Water Pump Failure: Commanded on, but the status is off.<br />

2. Hydronic Water Pump Running in Hand: Commanded off, but the status is on.<br />

3. Hydronic Water Pump Runtime Exceeded: Status runtime exceeds a user definable limit.<br />

4. Hydronic Water Pump VFD Fault.<br />

E. Hydronic Water Pressure Control:<br />

1. The controller shall measure hydronic water pressure and modulate the hydronic water<br />

pump VFD to maintain its chilled water pressure setpoint. The following setpoints<br />

are recommended values. All setpoints shall be field adjusted during the commissioning<br />

period to meet the requirements of actual field conditions.<br />

2. The controller shall modulate hydronic water pump speed to maintain a hydronic water<br />

pressure of 30 lbf/in 2 (adj.). The VFD minimum speed shall not drop below 20% (adj.).<br />

3. Alarms shall be provided as follows:<br />

Contract 44577 KW Annex - Rev. D 44577-CSI-SPEC-001 230993 - 17<br />