01.10.2013 Views

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sludge Treatment Project Engineered Container Retrieval and Transfer System January 2012<br />

<strong>SECTION</strong> 221513 - GENERAL SERVICE COMPRESSED AIR PIP<strong>IN</strong>G<br />

PART 1 - GENERAL<br />

1.1 RELATED DOCUMENTS<br />

A. Drawings and general provisions of the Contract, including General and Supplementary<br />

Conditions and Division 01 Specification Sections, apply to this Section.<br />

1.2 SUMMARY<br />

A. This Section includes the following:<br />

1. General Service Compressed Air Piping and specialties designated "Instrument Air Piping".<br />

2. General Service compressed air / instrument air piping to tanks, valves, fittings, and accessories<br />

within the building envelope.<br />

3. Pipes, Tubes, and Fittings.<br />

4. Thermoplastic Tubing.<br />

5. Stainless-Steel Braided PTFE Hose (1” and smaller).<br />

6. Elastomeric Flexible Hose (Larger than 1”).<br />

7. Ball Valves.<br />

8. Check Valves.<br />

9. Safety Valves.<br />

10. Pressure Control Valves (ECRT-PCV-755, ECRT-PCV-760 through 766).<br />

11. Quick Couplings.<br />

12. Welding Materials.<br />

13. Fasteners.<br />

14. Joining Materials.<br />

15. Structural Materials.<br />

Contract 44577 KW Annex – Rev. E 44577-CSI-SPEC-001 221513 - 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!