Sludge Treatment Project Engineered Container Retrieval and Transfer System December 2011<br />

PART 3 - EXECUTION<br />

3.1 PREPARATION<br />

A. Protect benchmarks and survey control points from disturbance during construction.<br />

B. Protect existing site improvements to remain from damage during construction.<br />

1. Restore damaged improvements to their original condition, as acceptable to Buyer’s<br />

Technical Representative.<br />

3.2 TEMPORARY EROSION CONTROL<br />

A. Provide temporary erosion-control measures to prevent soil erosion and discharge of soilbearing<br />

water runoff or airborne dust to adjacent areas and walkways according to Site<br />

Drawings and requirements of authorities having jurisdiction.<br />

B. Inspect, maintain, and repair erosion-control measures during construction until final grades are<br />

established and stabilized.<br />

C. Restore and stabilize areas disturbed during removal of erosion control measures.<br />

3.3 EXIST<strong>IN</strong>G UTILITIES<br />

A. Locate, identify, disconnect, and seal or cap utilities indicated to be removed or abandoned in<br />

place.<br />

1. Arrange with Buyer’s Technical Representative to shut off indicated utilities.<br />

B. Interrupting Existing Utilities: Do not interrupt utilities serving facilities unless permitted under<br />

the following conditions and then only after arranging to provide temporary utility services<br />

according to requirements indicated:<br />

1. Notify Buyer’s Technical Representative not less than five (5) days in advance of<br />

proposed utility interruptions.<br />

2. Do not proceed with utility interruptions without Buyer’s Technical Representative’s<br />

written permission.<br />

3.4 CLEAR<strong>IN</strong>G AND GRUBB<strong>IN</strong>G<br />

A. Remove obstructions, shrubs, and other vegetation to permit installation of new construction.<br />

B. Fill depressions caused by clearing and grubbing operations with approved fill material unless<br />

further excavation or earthwork is indicated.<br />

Contract 44577 KW Annex - Rev. D 44577-CSI-SPEC-001 311000 - 2