Sludge Treatment Project Engineered Container Retrieval and Transfer System January 2012<br />

15. Correct deficiencies in the Work that test reports and inspections indicate do not comply<br />

with the Contract Documents.<br />

3.14 PROTECTION OF LIQUID FLOOR TREATMENTS<br />

A. Protect liquid floor treatment from damage and wear during the remainder of construction<br />

period. Use protective methods and materials, including temporary covering, recommended in<br />

writing by liquid floor treatments installer.<br />

END OF <strong>SECTION</strong> <strong>033000</strong><br />