Qualify Schedule Using PGM<br />

The schedule can be qualified using a PGM. This means even if the schedule is valid the schedule can be made<br />

invalid if the PGM turns on or off. This can be used to change the way a reader functions when the area arms.<br />

The qualify schedule PGM can be used to prevent access to a door if a specific output has been activated.<br />

SC001 Qualify<br />

pgm: --000:00<br />

To modify the period one start time use the keypad as explained in the section Entering Time and Date Values<br />

(see page 342) and press [ENTER].<br />

Period One Start Time<br />

The schedule has a total of four periods. Each period defines a time for start and a time for end as well as the<br />

days of the week that the period is valid on. A period also has the holiday groups that define how the period<br />

functions if a holiday is active. To use period one program a starting time for the first period.<br />

SC001 Start<br />

P1 Time: --:--<br />

To modify the period one start time use the keypad as explained in the section Entering Time and Date Values<br />

(see page 342) and press [ENTER].<br />

Period One End Time<br />

To use the period one program an ending time for the first period.<br />

SC001 End<br />

P1 Time: --:--<br />

To modify the period one start time use the keypad as explained in the section Entering Time and Date Values<br />

(see page 342) and press [ENTER].<br />

Period One Days Of Week<br />

Program the days of the week that period one is valid on using the option entry function. Each option select<br />

value selects the appropriate day of the week.<br />

SC001 P1 Days<br />

[--------]<br />

To modify options, use the keypad as explained in section Entering Data Options (see page 344).<br />

Option 1 - Monday<br />

• Enabled the period will operate on Monday.<br />

• Disabled the period will not operate on Monday.<br />

Option 2 - Tuesday<br />

• Enabled the period will operate on Tuesday.<br />

• Disabled the period will not operate on Tuesday.<br />

Option 3 - Wednesday<br />

• Enabled the period will operate on Wednesday.<br />

• Disabled the period will not operate on Wednesday.<br />

Option 4 - Thursday<br />

• Enabled the period will operate on Thursday.<br />

• Disabled the period will not operate on Thursday.<br />