20.01.2015 Views

Protege System Controller Reference Manual

Protege System Controller Reference Manual

Protege System Controller Reference Manual

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Option 5 - Friday<br />

• Enabled the period will operate on Friday.<br />

• Disabled the period will not operate on Friday.<br />

Option 6 - Saturday<br />

• Enabled the period will operate on Saturday.<br />

• Disabled the period will not operate on Saturday.<br />

Option 7 - Sunday<br />

• Enabled the period will operate on Sunday.<br />

• Disabled the period will not operate on Sunday.<br />

Option 8 - Reserved<br />

• Reserved do not modify<br />

Enabling/disabling or modifying the settings of reserved options is not recommended.<br />

Period One Holiday Group<br />

There are eight holiday groups that can be assigned to a schedule. A holiday when active will have a holiday<br />

group(s) associated with it. If the period does not have any holiday group settings then it will not function on the<br />

day that the holiday is valid. The process is an and process, that is if any of the holiday group options are valid<br />

and any of the period holiday group settings are in common with the programmed value the schedule will<br />

operate. Each option select value selects the appropriate holiday group.<br />

SC001 P1 Hols<br />

[--------]<br />

To modify options, use the keypad as explained in section Entering Data Options (see page 344).<br />

Option 1 - Holiday Group One<br />

• Enabled the period will operate if a holiday is valid and has the group one option set.<br />

• Disabled the period will not operate if the holiday group one is active.<br />

Option 2 - Holiday Group Two<br />

• Enabled the period will operate if a holiday is valid and has the group two option set.<br />

• Disabled the period will not operate if the holiday group two is active.<br />

Option 3 - Holiday Group Three<br />

• Enabled the period will operate if a holiday is valid and has the group three option set.<br />

• Disabled the period will not operate if the holiday group three is active.<br />

Option 4 - Holiday Group Four<br />

• Enabled the period will operate if a holiday is valid and has the group four option set.<br />

• Disabled the period will not operate if the holiday group four is active.<br />

Option 5 - Holiday Group Five<br />

• Enabled the period will operate if a holiday is valid and has the group five option set.<br />

• Disabled the period will not operate if the holiday group five is active.<br />

Option 6 - Holiday Group Six<br />

• Enabled the period will operate if a holiday is valid and has the group six option set.<br />

• Disabled the period will not operate if the holiday group six is active.<br />

PRT-CTRL-SE <strong>Protege</strong> <strong>System</strong> <strong>Controller</strong> <strong>Reference</strong> <strong>Manual</strong> | PRT-CTRL-SE 283

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!