31.12.2012 Views

Bulletin 2012/02 - European Patent Office

Bulletin 2012/02 - European Patent Office

Bulletin 2012/02 - European Patent Office

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(B29C) I.1(1)<br />

(74) Ribeiro, James Michael, Withers & Rogers<br />

LLP 4 More London Riverside, London SE1<br />

2AU, GB<br />

(51) B29C 70/34 (11) 2 403 706 A2*<br />

(25) En (26) En<br />

(21) 10706435.4 (22) 23.<strong>02</strong>.2010<br />

(84) AT BE BG CH CY CZ DE DK EE ES FI FR GB<br />

GR HR HU IE IS IT LI LT LU LV MC MK MT<br />

NL NO PL PT RO SE SI SK SM TR<br />

(86) US 2010/<strong>02</strong>5110 23.<strong>02</strong>.2010<br />

(87) WO 2010/101741 2010/36 10.09.2010<br />

(88) 23.12.2010<br />

(30) <strong>02</strong>.03.2009 US 396418<br />

(54) • VERFAHREN ZUR HERSTELLUNG VON<br />

KONTURIERTEN VERBUNDSTRUKTUREN<br />

UND DADURCH HERGESTELLTE STRUK-<br />

TUREN<br />

• METHOD FOR PRODUCING CONTOURED<br />

COMPOSITE STRUCTURES AND STRUC-<br />

TURES PRODUCED THEREBY<br />

• PROCÉDÉ DE FABRICATION DE STRUC-<br />

TURES COMPOSITES PROFILÉES ET<br />

STRUCTURES OBTENUES PAR CE PRO-<br />

CÉDÉ<br />

(71) The Boeing Company, 100 North Riverside<br />

Plaza, Chicago, IL 60606-2016, US<br />

(72) MCCARVILLE, Douglas A., Orting Washington<br />

98360, US<br />

SWEETIN, Joseph L., Lake Forest Park<br />

Washington 98155, US<br />

GUZMAN, Juan C., Seattle Washington<br />

98133, US<br />

(74) McLeish, Nicholas Alistair Maxwell, Boult<br />

Wade Tennant Verulam Gardens 70 Gray's<br />

Inn Road, London WC1X 8BT, GB<br />

(51) B29C 70/38 (11) 2 403 707 A2*<br />

B29C 70/48 F03D 1/06<br />

(25) En (26) En<br />

(21) 10706269.7 (22) 05.03.2010<br />

(84) AT BE BG CH CY CZ DE DK EE ES FI FR GB<br />

GR HR HU IE IS IT LI LT LU LV MC MK MT<br />

NL NO PL PT RO SE SI SK SM TR<br />

(86) EP 2010/052801 05.03.2010<br />

(87) WO 2010/10<strong>02</strong>50 2010/36 10.09.2010<br />

(88) 13.01.2011<br />

(30) 06.03.2009 EP 09154539<br />

(54) • VERFAHREN UND FERTIGUNGSSTRASSE<br />

ZUR HERSTELLUNG VON WINDTURBI-<br />

NENSCHAUFELN<br />

• METHOD AND MANUFACTURING LINE<br />

FOR MANUFACTURING WIND TURBINE<br />

BLADES<br />

• PROCÉDÉ ET CHAÎNE DE FABRICATION<br />

POUR FABRIQUER DES PALES D'ÉO-<br />

LIENNE<br />

(71) LM Glasfiber A/S, Jupitervej 6, 6000 Kolding,<br />

DK<br />

(72) BØRSTING, Dennis André, DK-6000 Kolding,<br />

DK<br />

ZHOU, Quinyin, DK-5792 Årslev, DK<br />

VAN DER ZEE, Jacobus Johannes, DK-6000<br />

Kolding, DK<br />

(74) Jensen, Peter Kim, et al, C/o Chas. Hude A/S<br />

H.C. Andersens Boulevard 33, 1780 Copenhagen<br />

V, DK<br />

B29C 70/44 → (51) B29C 70/32<br />

B29C 70/46 → (51) B29C 43/36<br />

(51) B29C 70/48 (11) 2 403 708 A1*<br />

B29C 33/34 B29L 31/08<br />

(25) En (26) En<br />

(21) 10706270.5 (22) 05.03.2010<br />

(84) AT BE BG CH CY CZ DE DK EE ES FI FR GB<br />

GR HR HU IE IS IT LI LT LU LV MC MK MT<br />

NL NO PL PT RO SE SI SK SM TR<br />

Europäisches <strong>Patent</strong>blatt<br />

<strong>European</strong> <strong>Patent</strong> <strong>Bulletin</strong><br />

<strong>Bulletin</strong> européen des brevets<br />

(86) EP 2010/0528<strong>02</strong> 05.03.2010<br />

(87) WO 2010/10<strong>02</strong>51 2010/36 10.09.2010<br />

(30) 06.03.2009 EP 09154538<br />

(54) • VERFAHREN UND FERTIGUNGSSTRASSE<br />

ZUR HERSTELLUNG VON WINDTURBI-<br />

NENSCHAUFELN<br />

• METHOD AND MANUFACTURING LINE<br />

FOR MANUFACTURING WIND TURBINE<br />

BLADES<br />

• PROCÉDÉ ET LIGNE DE PRODUCTION<br />

POUR FABRICATION DE PALES D'ÉO-<br />

LIENNE<br />

(71) LM Glasfiber A/S, Jupitervej 6, 6000 Kolding,<br />

DK<br />

(72) MORTENSEN, Ivan Engmark, DK-6000<br />

Kolding, DK<br />

(74) Jensen, Peter Kim, et al, c/o Chas. Hude H.C.<br />

Andersens Boulevard 33, 1780 Copenhagen<br />

V, DK<br />

B29C 70/48 → (51) B29C 70/38<br />

B29C 70/52 → (51) B29C 43/36<br />

(51) B29D 11/00 (11) 2 403 709 A1*<br />

(25) En (26) En<br />

(21) 10712193.1 (22) 01.03.2010<br />

(84) AT BE BG CH CY CZ DE DK EE ES FI FR GB<br />

GR HR HU IE IS IT LI LT LU LV MC MK MT<br />

NL NO PL PT RO SE SI SK SM TR<br />

(86) US 2010/<strong>02</strong>5773 01.03.2010<br />

(87) WO 2010/101831 2010/36 10.09.2010<br />

(30) <strong>02</strong>.03.2009 US 396019<br />

(54) • OPHTHALMISCHE FREIFORMLINSE<br />

• FREE FORM OPHTHALMIC LENS<br />

• LENTILLE OPHTALMIQUE DE FORME<br />

LIBRE<br />

(71) Johnson & Johnson Vision Care Inc., 7500<br />

Centurion Parkway, Jacksonville, FL 32256,<br />

US<br />

(72) WIDMAN, Michael, F, Jacksonville FL 32223,<br />

US<br />

ENNS, John, B., Jacksonville FL 32257, US<br />

POWELL, P., Mark, Jacksonville FL 32258,<br />

US<br />

SITES, Peter, W., Orange Park FL 32003, US<br />

(74) Tunstall, Christopher Stephen, Carpmaels &<br />

Ransford One Southampton Row, London<br />

WC1B 5HA, GB<br />

(51) B29D 30/24 (11) 2 403 710 A1*<br />

B29D 30/26 B29D 30/32<br />

(25) En (26) En<br />

(21) 10788417.3 (22) 26.11.2010<br />

(84) AL AT BE BG CH CY CZ DE DK EE ES FI FR<br />

GB GR HR HU IE IS IT LI LT LU LV MC MK<br />

MT NL NO PL PT RO RS SE SI SK SM TR<br />

(86) NL 2010/050796 26.11.2010<br />

(87) WO 2011/065829 2011/22 03.06.2011<br />

(30) 26.11.2009 NL 2003874<br />

27.11.2009 US 283091 P<br />

(54) • REIFENBAUTROMMEL MIT AUFWÄRTS-<br />

DREHMECHANISMUS<br />

• TYRE BUILDING DRUM WITH TURN-UP<br />

MECHANISM<br />

• TAMBOUR DE CONFORMATION DE<br />

PNEUMATIQUE AVEC MÉCANISME DE<br />

RETOURNEMENT<br />

(71) VMI Holland B.V., Gelriaweg 16, 8161 RK<br />

Epe, NL<br />

(72) DE GRAAF, Martin, NL-8166 KZ Emst, NL<br />

SLOTS, Antonie, NL-8111 RS Heeten, NL<br />

MULDER, Gerrit, NL-8167 NS Oene, NL<br />

RODIJK, Gerrit, NL-8171 BW Vaassen, NL<br />

GRASHUIS, Jan, Kornelis, NL-7329 CG<br />

Apeldoorn, NL<br />

(74) Peters, Sebastian Martinus, Octrooibureau<br />

Vriesendorp & Gaade B.V. Dr. Kuyperstraat<br />

6, 2514 BB Den Haag, NL<br />

67<br />

Anmeldungen<br />

Applications<br />

Demandes (<strong>02</strong>/<strong>2012</strong>) 11.01.<strong>2012</strong><br />

B29D 30/26 → (51) B29D 30/24<br />

B29D 30/32 → (51) B29D 30/24<br />

B29L 31/08 → (51) B29C 70/48<br />

B30B 11/<strong>02</strong> → (51) B22F 3/03<br />

B30B 15/<strong>02</strong> → (51) B22F 3/03<br />

(51) B32B 1/08 (11) 2 403 711 A1*<br />

B32B 5/<strong>02</strong> F16C 13/00<br />

(25) De (26) De<br />

(21) 10705819.0 (22) 24.<strong>02</strong>.2010<br />

(84) AT BE BG CH CY CZ DE DK EE ES FI FR GB<br />

GR HR HU IE IS IT LI LT LU LV MC MK MT<br />

NL NO PL PT RO SE SI SK SM TR<br />

(86) EP 2010/001127 24.<strong>02</strong>.2010<br />

(87) WO 2010/099886 2010/36 10.09.2010<br />

(30) 06.03.2009 DE 1<strong>02</strong>009011585<br />

(54) • BAUTEIL UND VERFAHREN ZU SEINER<br />

HERSTELLUNG<br />

• COMPONENT AND METHOD FOR THE<br />

PRODUCTION THEREOF<br />

• ÉLÉMENT ET SON PROCÉDÉ DE FABRI-<br />

CATION<br />

(71) Frank, Egon, Brunnenstrasse 27, 97531<br />

Theres, DE<br />

(72) Frank, Egon, 97531 Theres, DE<br />

(74) Gosdin, Michael, Adam-Stegerwald-Strasse<br />

6, 97422 Schweinfurt, DE<br />

(51) B32B 3/12 (11) 2 403 712 A1*<br />

E04C 2/36<br />

(25) De (26) De<br />

(21) 11707838.6 (22) 08.03.2011<br />

(84) AL AT BE BG CH CY CZ DE DK EE ES FI FR<br />

GB GR HR HU IE IS IT LI LT LU LV MC MK<br />

MT NL NO PL PT RO RS SE SI SK SM TR<br />

(86) EP 2011/053429 08.03.2011<br />

(87) WO 2011/110538 2011/37 15.09.2011<br />

(30) 11.03.2010 DE 1<strong>02</strong>010011148<br />

(54) • LEICHTBAUPLATTE SOWIE VERFAHREN<br />

UND VORRICHTUNG ZU DEREN HER-<br />

STELLUNG<br />

• LIGHTWEIGHT BUILDING BOARD AND<br />

METHOD AND DEVICE FOR THE PRO-<br />

DUCTION THEREOF<br />

• PANNEAU AINSI QUE PROCÉDÉ ET DIS-<br />

POSITIF POUR SA FABRICATION<br />

(71) Fritz Egger GmbH & Co. OG, Tiroler Strasse<br />

16, 3105 Unterradlberg, AT<br />

(72) RIEPERTINGER, Manfred, 83093 Bad<br />

Endorf, DE<br />

(74) Cohausz & Florack, Bleichstraße 14, 4<strong>02</strong>11<br />

Düsseldorf, DE<br />

B32B 3/24 → (51) E04B 1/78<br />

B32B 3/28 → (51) A62D 5/00<br />

B32B 5/00 → (51) C23C 16/27<br />

B32B 5/<strong>02</strong> → (51) B32B 1/08<br />

B32B 5/04 → (51) A62D 5/00<br />

B32B 5/06 → (51) D04H 13/00<br />

B32B 5/18 → (51) A62D 5/00<br />

B32B 5/24 → (51) A62D 5/00<br />

(51) B32B 7/12 (11) 2 403 713 A1*<br />

B32B 27/36<br />

H01L 31/048<br />

B32B 27/28<br />

(25) En (26) En<br />

(21) 09789931.4 (22) 24.06.2009

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!