3rd International Scientific and Professional Conference<br />

CORRIDOR <strong>10</strong> - a sustainable way of integrations<br />

For the Republic of Slovenia there are three RNE Corridors that are of highest importance, namely:<br />

- 07: Gdynia - Ponetów/Warszawa - Katowice - Wien/Bratislava - Trieste/Koper<br />

- 08: Lyon/Dijon - Torino - Ljubljana/Koper – Budapest<br />

- 11: München - Salzburg - Ljubljana - Zagreb - Beograd - Sofia – Istanbul<br />

The objectives of RNE Corridors are:<br />

- the harmonization of the procedure for the creation of timetables and allocation of railways<br />

- to ensure the liberalization of the market<br />

- the use of information technology tools<br />

- manufacture of joint coordinated programmes of networks<br />

- -organization of the legal proceedings, CER, UIC, UNIFE<br />

3.6 The TEN-T network<br />

The TEN-T network is composed of 2 timely separate projects. The first project is aimed at the central<br />

or core network, which will be completed by 2030. The construction of this network will facilitate the<br />

use of an approach that is based on ten existing corridors, which will provide the basis for a<br />

coordinated development of infrastructure within the TEN-T network. The second project is an<br />

extensive power network, which will be completed by 2050 and will provide complete coverage of the<br />

European Union and access to all regions.<br />

The new network will assure safer transport, the elimination of bottlenecks and smoother and faster<br />

traveling. Therefore, the European Union will help with financing the central network in the next<br />

financial perspective 2014-2020, since the original costs were approximately 250 billion Euros. The<br />

European union will support the performance of the network with several financial instruments, inter<br />

alia, with funds from the Cohesion Fund, the European Regional Development Fund and loans from<br />

the European Investment Bank and credit guarantees.<br />

Slovenia is, in the proposal for a regulation of guidelines for the development of the TEN-T network,<br />

included in the so-called Mediterranean corridor, which route runs from Algeciras through Madrid,<br />

Barcelona, Lyon, and Turin to Milan. The corridor crosses the Slovenian border in Koper and<br />

continues through Ljubljana and Maribor to Budapest and to the Ukrainian border. The Mediterranean<br />

corridor almost completely corresponds the route of the current V th Paneuropean corridor and for now,<br />

Slovenia is included in this corridor, but since there are plans for infrastructure modernization, is the<br />

actual inclusion of Slovenia questionable. Hereby I have in mind the rail line between Trieste and<br />

Divača, second track Koper – Divača and the rail line between Ljubljana and Ljubljana Jože Pučnik<br />

Airport.<br />

4. THE X TH PANEUROPEAN CORRIDOR AND ALTERNATIVE ROUTES<br />

The X th Paneuropean Corridor runs through Salzburg – Jesenice – Ljubljana – Dobova – Zagreb –<br />

Beograd – Skopje – Thessaloniki/Solun. Its route was placed in the network of transport corridor as in<br />

1997, as a result of wars in the southeastern Balkan.<br />

Belgrade, 2012 <strong>10</strong>3