26.12.2014 Views

Zbornik radova Koridor 10 - Kirilo Savić

Zbornik radova Koridor 10 - Kirilo Savić

Zbornik radova Koridor 10 - Kirilo Savić

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3rd International Scientific and Professional Conference<br />

CORRIDOR <strong>10</strong> - a sustainable way of integrations<br />

Figure 3: Block sections for the selected signal [2]<br />

4.2 Construction (input) of timetable<br />

Apart from having infrastructure data before running track possession simulation the timetable in force<br />

(valid) need to be entered. RailSys uses “Timetable Manager” module for creation of the valid<br />

timetable.<br />

The first step is to define locomotives, railcars and train compositions in terms of tracking force<br />

diagrams, resistance curves, train length, weight etc.<br />

Based on a station route and regime a timetable train path is calculated for each train by the program<br />

producing results in tabular and graphical view.<br />

Train path needs to be defined for all trains in existing timetable. This is shown in the figure below.<br />

Figure 3: Selected train route [2]<br />

Belgrade, 2012 214

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!