3rd International Scientific and Professional Conference<br />

CORRIDOR <strong>10</strong> - a sustainable way of integrations<br />

Figure 3. Positions of Belgrade and Novi Sad ports<br />

Apatin is new port under construction with great potential and ambitions. Following stages are<br />

necessary to crate port and logistic centre functionality:<br />

Phase I: rehabilitation of railroad: Apatin factory - Sonta - 12 km.<br />

Phase II: rehabilitation of railroad: Apatin factory - Sombor - 25 km.<br />

Transportation route Timisoara - Kikinda - Subotica - Apatin – Bogojevo is very important for full functioning<br />

of port and intermodal terminal. To perform its function, it is necessary to rehabilitate railroads: Kikinda -<br />

Senta - Subotica, Sombor - Vrbas and Bogojevo - Odžaci - Novi Sad (Figure 4).<br />

Figure 4. Positions of Apatin port<br />

Another port in this region is Danube port in Bogojevo. This port is for bulk cargo, which operates on<br />

the 3P principle (Private - Public - Partnership). It should be noted that this port has a stable<br />

development. The limiting factor is the lack of a rail link station Bogojevo. To achieve this the railroad<br />

Bogojevo - Danube coast should revitalized in length of I 2.7 km. Of course, for the good functioning of<br />

the port and to realize the full potential it is needed to revitalize the railway Bogojevo - Odžaci - Novi<br />

Sad in a length of 55 km (Figure 5).<br />

Belgrade, 2012 32