3rd International Scientific and Professional Conference<br />

CORRIDOR <strong>10</strong> - a sustainable way of integrations<br />

stops Horná Streda, Brunovce and Považany, realization of 2 new railway bridges over roads,<br />

reconstruction of 2 existing railway bridges and 6 road flyovers including the bridge over river Dubová,<br />

creation of 6 new railway underpasses for passengers and public in the railway stops and stations as<br />

well as 2 underpasses as luggage tunnels.<br />

Fig. 5 Modernised RS Nové Mesto nad Váhom in the direction from Bratislava [5]<br />

In 2007 the construction of platforms at RS Prešov and RS Poprad-Tatry was completed and from<br />

2008 to 2011 a part of the corridor no. VI in the section Žilina – Krásno nad Kysucou (11.326 km) was<br />

modernised. This line was divided into 4 sections, 2 of them were the railway stations Kysucké Nové<br />

Mesto and Krásno nad Kysucou and 2 interstational sections on the line, railway stops Brodno,<br />

Rudina, Ochodnica and Dunajov. The rebuilding and reconstruction included 9 bridge objects, 2 road<br />

objects and 1 new railway bridge, underpasses for passengers in the railway stations and 2 footbridges.<br />

Within the modernisation 12 crossings altogether were reconstructed (in the sections where<br />

the designed speed is < 160 km.h -1 ).<br />

A present, in relation to the Program of Modernisation and Development of Railway Infrastructure for<br />

2011 to 2014, that was approved by the Slovak government in <strong>10</strong>/20<strong>10</strong>, the preparation or realization<br />

of several structures within the modernisation of Slovak railway infrastructure is in progress. On the<br />

basis of this plan, in 2011 - 2014 another 56.800 km of lines will be built and in 2015 another 30.200<br />

km. The steps of the modernisation of the corridor no. Va, no. VI and TEN-T 17, including the financial<br />

costs for their realization are given by Fig. 6.<br />

Fig. 6 Plan of modernisation of the corridors no. Va and no.VI [1]<br />

The track section of the corridor no. Va between RS Nové Mesto nad Váhom and RS Púchov is<br />

supposed to be completed by 2014. The construction is divided into 6 stages:<br />

Nové Mesto nad Váhom - Zlatovce – 1.and 2. stage,<br />

Zlatovce - Trenčianska Teplá – 3. stage,<br />

Trenčianska Teplá - Beluša – 4 and 5. stage,<br />

Beluša - Púchov – 6.stage.<br />

The section Nové Mesto nad Váhom - Zlatovce will undergo the modernisation of 17.475 km of railway<br />

line. The construction works started on 29.9.2009 and the work completion is planned for May 2013.<br />

Belgrade, 2012 85