3rd International Scientific and Professional Conference<br />

CORRIDOR <strong>10</strong> - a sustainable way of integrations<br />

Figure 6: Simulation view after track close and delay of the selected train [2]<br />

The chart above reveals impact of station track possession to train 38022 having 15 min and train<br />

2402 having 17 sec of delay, respectively.<br />

The table below gives comparison of actual valid timetable and the timetable resulted due to track<br />

possession.<br />

Figure 7: Timetables before and after travck possession including – delays and stopovers<br />

The second line in the table above gives run times and simulated delays at Ljubljana station showing<br />

that stopover time should be shorter in order for the train to be dispatched from the train in time<br />

(13:55).<br />