ÖBB-Method (see figure 4):<br />

Start of the interlinked level of occupation:<br />

- All trains which timetable graphs, also partially, extend into the defined calculation period<br />

(see fig. train 1-3).<br />

- The trains entering the calculation step before the starting time are not changed in the<br />

process of compression (see at train number 1 and 2).<br />

- In the process of compression the first train entering the calculation step after the starting<br />

time (train number 3) is pushed to the train ahead until the first block section occupation is<br />

equal to the starting time.<br />

End of the calculation period:<br />

- The last train entering the section before the calculation period is over. The remaining<br />

timetable graph may be outside of the calculation period (see fig. train number 4).<br />

- When the process of compression has been finished the occupation time comes to the<br />

result of the difference between the starting time of the calculation period and the finishing<br />

time of the first block section occupation belonging to the last train.<br />

Figure 4: DB- and ÖBB-method for calculation of the interlinked level of occupation [8]<br />

After the program determines which train passes are to be compressed, the timetable compression<br />

begins with<br />

the first train that travels the entire calculation step in the calculation period (2.a.) (ÖBB- and<br />

DB-method) or<br />

the first train that starts in the calculation step after the calculation period has begun and<br />

passes a portion of the line (2.b.) (ÖBB- and DB-method) or<br />

Belgrade, 2012 205