3rd International Scientific and Professional Conference<br />

CORRIDOR <strong>10</strong> - a sustainable way of integrations<br />

substantial part of relocation is formed by railway flyover that is, 753 m long. The bridge structure from<br />

pre-stressed concrete, 753 m long, is a unique structure on Slovak railway lines.<br />

To summarize the time interval of this construction – the beginning of project preparation was in 1994,<br />

the completion in 2007. From the present point of view 14 years is a too long period to be considered<br />

acceptable for an investor, especially in case of 50 km- long section. But these were the beginnings of<br />

modernisation…. .<br />

Fig. 3 Relocation Šenkvice<br />

The modernisation of the line Trnava – Nové Mesto nad Váhom in the section RS Trnava – RS<br />

Piešťany started in 2004 and was completed in 2008. It was divided into track sections:<br />

Trnava – Piešťany (32.950 km) and<br />

Piešťany – Nové Mesto nad Váhom (19.980 km).<br />

The modernisation of the track section Trnava – Piešťany consisted of the reconstruction of RS<br />

Leopoldov and RS Veľké Kostoľany, 3 railway stops (Brestovany, Madunice, Drahovce) and 4 interstational<br />

sections. The modernisation works also included construction of 5 new railway bridges,<br />

reconstruction of 7 existing railway bridges, construction of 5 road bridge objects, 8 underpasses,<br />

1 luggage tunnel and a railway footbridge. The most complicated part of the construction was the<br />

reconstruction of RS Leopoldov, that is an important railway node in the region (Fig. 4).<br />

Fig. 4 Modernised RS Leopoldov [5]<br />

The modernisation of the track section Piešťany – Nové Mesto nad Váhom was divided into 5 parts,<br />

two of them were RS Piešťany and RS Nové Mesto nad Váhom (Fig. 5) and the other 2 were<br />

interstational sections. The modernisation comprised the construction and renovation of the railway<br />

Belgrade, 2012 84