12.07.2015 Views

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

21. HOURLY-REPORT.The HOURLY-REPORT instruction directs the program to print the hourlyvalues of all variables specified in one or more REPORT-BLOCK instructions.Examples of the HOURLY-REPORTs may be seen in Chap. VII.HOURLY-REPORTThis command tells the program that the data to followspecify hourly output reports on the simulation data.REPORT-SCHEDULE is the U-name of a previously specified schedule whichwill be used here for report generation~purposes.REPORT-BLOCKOPTIONAXIS-ASSIGNAXIS-TITLESAXIS-MAXInput for this keyword is a code-word list of U-names thathave been specified under one or more (maximum of 64)REPORT-BLOCK instructions. Note that REPORT-BLOCK is botha keyword (here) and a command (next topic.)Input for this keyword is the code-word which specifiesthe format to be used in presenting the HOURLY-REPORTdata. The code-word PRINT, which is the default value,produces output report(s) with numerical data displayed intabular form. The code-word PLOT produces graphic plot(s)of the same data. It is possible to plot up to 12variables on 1 or 2 horizontal axes (abscissas). Thevariables can be taken from one or more REPORT-BLOCKinstructions.If PLOT is chosen, it is necessary to also specify thefollowing keywords.is a list of up to 12 integers (lor 2), which representaxes numbers. One integer (axis number) should appear inthe list for each VARIABLE-LIST value in the REPORT-BLOCKcommand. This assigns each variable to be plotted to aspeclflc axis. The ordering of the axis numbers in thiskeyword list should match the ordering of the variables inthe VARIABLE-LIST instruction.is a list of up to two literal values that will appear onone or two horizontal axes (abscissas), one literal valueper axis. The first title is assigned to axis 1; thesecond title is assigned to axis 2. The month, day, andhour automatically appear on the vertical (ordinate)axis. Remember that the literal values must be separatedby a comma and each literal must be enclosed in asterisks(*' s).is a list of up to 2 values (one per axis) that specifythe maximum value on the horizontal (abscissa) axis. Thevalues are entered in the same order as the axes arenumbered. Care should be exercised in choosing thesevalues because it is possible to specify values below theIII.127 (Revised 5/81)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!