12.07.2015 Views

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TABLE IV.45Code-WordSS-ASS-BSS-CSS-DSS-ESS-FSUMMARYSYSTEM MONTHLY LOADS SUMMARY - Summarizes, by month andyear, the heating, cooling, and electrical consumption ofeach total system (central system plus associated zonesystems). For each month there are listed maximum hourlyload, the time of maximum hourly load (with exterior wetanddry-bulb temperatures), and the cumulative loads onthe PLANT by th is sys tem.SYSTEM MONTHLY LOADS SUMMARY - Summarizes, by month andyear, the heating and cooling consumption of theH VAC-equi pment located in all the zones of each sys tern(that is HVAC equipment that is remote to the centralsystem such as zone heating and cooling coils). For eachmonth there are listed the maximum hourly load, thecumulative load, the baseboard heating cumulative andmaximum loads, and the preheat cumulative and maximumloads.SYSTEM MONTHLY LOAD HOURS - Summarizes, by month, thenumber of cooling load hours, heating load hours, andconcurrent heating/cooling hours. Also summarized bymonth are the heating load at the time of the cool ing peakand the electric load at the time of the cooling peak.PLANT MONTHLY LOADS SUMMARY - Summarizes, by month andyear, the heating, cooling, and electrical consumption ofall systems associated with the plant (or eachPLANT-ASSIGNMENT since a maximum of four PLANT-ASSIGNMENTsmay be made for a single computer run). For each monththere are listed the maximum hourly load, the time ofmaximum hourly load (with exterior wet- and dry-bulbtemperatures), and the cumulative loads.PLANT MONTHLY LOAD HOURS - Summarizes for all systems inthe plant (or PLANT-ASSIGNMENT), by month, the number ofcooling load hours, heating load hours, and concurrentheating/cool ing hours. Also summarized by month are theheating loads at the time of the cooling peak and theelectric loads at the time of the cool ing peak.ZONE MONTHLY DEMAND SUMMARY - Summarizes, by month, foreach zone of each system named in a PLANT-ASSIGNMENTinstruction, the heating and cooling loads, the baseboardheating cumulative and maximum hourly loads, the maximumzone temperature, the minimum zone temperature, and thenumber of hours that the loads were not met (that is,underheated and/or undercooled).IV.270 (Revised 5/81)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!