12.07.2015 Views

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5. POL and CBS Input Instruction LimitationsFor <strong>DOE</strong>-2, the maximum number of POL instructions that can be used forspecifying the required data for the PLANT program is as follows:InstructionDAY-SCHEDULEWEEK-SCHEDULESCHEDULEPARAMETERSET-DEFAULTTITLEPLANT-EQUIPMENTPART -L OAD-RA TI 0PLANT-PARAMETERSEQUIPMENT-QUADLOAD-ASSIGNMENTLOAD-MANAGEMENTHEAT-RECOVERYENERGY-STORAGE (hot tank)ENERGY-STORAGE (cold tank)ENERGY-COSTREFERENCE-COSTSPLANT COSTSPLANT-ASSIGNMENTPLANT-REPORTHOURLY-REPORTREPORT-BLOCKU-namesSolar SimulatorSOLAR-EQUIPMENTCOMPONENTCONNECTITERATIONSSYSTEMTRACEDAY-SCHEDULEWEEK-SCHEDULESCHEDULEMaximum Number60404050*100*5*6 for each equipment type1 for each equipment type11501111525140**1 command1664l1S***140No. of components11No. of components202020* ThlS maximum number refers to the number of keyword values, not the numberof instructions.** This maximum number refers to the total number of different PLANT runsallowed in a single submittal. Only one PLANT-ASSIGNMENT is allowed foreach PLANT simulation.*** The use of the advanced scheduling technique (described in Chapter II) willresult in the use of at least three of these U-names for each SCHEDULEspecified. One U-name is specified by the user for the SCHEDULE and thebalance of the U-names are internally specified by POL. Also, specifyingan output report by code-word (PV-A, PS-A, etc.) will result in the use ofone U-name internally specified by POL.V.S(Revised 5/S1)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!