12.07.2015 Views

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Code-WordHEATI NGCOOLINGELECTRICALPLANT-EQUIPMENTNUMBERTABLE V. 7Load Assignment TYPEAssigned EquipmentPlant equipment and purchased steam assigned for heatingload.Plant equipment and purchased chilled water assigned forspace cooling loadPlant equipment and purchased electricity assigned forelectrical loads.identifies a U-named PLANT-EQUIPMENT instruction for theequipment assigned to meet the load. Up to three types ofPLANT-EQUIPMENT may be assigned for each load range (seeExample 1).In addition to U-named pieces of PLANT-EQUIPMENT, this maydesignate either a steam, chilled water, or electricUTILITY as an item to meet all or part of the electric;heating, or cooling loads. If any of these options isexercised, the user must further authorize the use ofpurchased steam, cooling, or electricity through theENERGY-COST instruction. The specification of the UNITkeyword in the ENERGY-COST instruction permits the use ofany combination of electric, chilled water, and steamutilities. Since the ENERGY-COST instruction default forUNIT is nonzero for purchased electricity, but zero forpurchased chilled water and steam, the utility automaticallymeets all electric loads not satisfied by on-site generation,but no heating or cooling loads will be met by autility unless UNIT is defined for purchased chilled waterand/or steam.identifies the number of units of the U-named equipmentassigned to meet the load. For example, if two units of asingle-stage machine named ABSOR1 are to be run along witha double-bundle chiller named DBUN1, the followingspecification is required.PLANT-EQUIPMENT = ABSOR1NUMBER = 2PLANT-EQUIPMENT = DBUN1NUMBER = 1If utility steam, chilled water, and/or electricity is tobe used, the user must specify the millions of Btu's ofutility to be supplied. The user entersV.53 (Revised 5/81)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!