12.07.2015 Views

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

REPORT LS-F - BUILDING MONTHLY LOAD COMPONENTS IN MBTUThis report gives a breakdown of loads on a monthly basis for the entirebuilding, according to the source of the load. The loads in unconditionedspaces are not included. All entries are in millions of Btus/month.As in Report LS-E, three types of loads are shown: heating (HEATNG),sensible cooling (SEN CL), and latent cooling (LAT CL). The reported sourcesof the load (WALLS, ROOFS, etc.) are defined in the LS-E report description.For multizone buildings, the load components are obtained by summing thecorresponding load components for each conditioned zone after multiplicationby the zone MVLTIPLIER. For; example, consider a building with two zones, Z-1and Z-2, with zone MULTIPLIERs of 2 and 3, respectively. If the heating loadcomponents in January due to glass conduction is -5.90 MBTU for Z-1 and -2.30MBTU for Z-2, then the corresponding building load component is 2 x (-5.90) +3 x (-2.30) = -18.10 MBTU.The total monthly heating and sensible cooling loads in the last columnof this report are the same as those given in Report LS-D, Building MonthlyLoads Summary, under the headings HEATING ENERGY and COOLING ENERGY.V 11. 43.9 (Revised 5/81)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!