12.07.2015 Views

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TABLE IV.1SDL CommandDAY-RESET -SCH and! or DAY-SCHEDULEWEEK-SCHEDULE • • • • • • • • •RESET-SCHEDULE and! or SCHEDULEZONE-AIRZONE-CONTROLZONE ••••CURVE-FIT ••SYSTEM-CONTROLSYSTEM-AIRS YS TEM-F ANS • •SYSTEM-TERMINALSYSTEM-FLUIDSYSTEM-EQUI PMENT.SYSTEM • • • • •PLANT-ASSIGNMENTSYSTEMS-REPORTHOURL Y-REPORTREPORT-BLOCKSPARAMETER •SET-DEFAULTTITLE •U-names • •Maximum Number60 combined4040 combined202064.1002020202020204041 command (200 reports)166450.100• 5.180** The use of the advanced schedul ing technique (described in Chapter II) willresult in the use of at 1 east three of these U-names for each SCHEDULE .specified. One U-name is specified by the user for the SCHEDULE and thebalance of the U-names are internally specified by SDL. Also, specifyingan output report by code-word (SV-A, SS-A, etc.) will result in the use ofone U-name internally specified by SDL.I V. 9 (Revised 5!81)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!