12.07.2015 Views

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Input data required for the simulation of this mode of operation is:H-SCH1 = SCHEDULEC-SCH1 = SCHEDULESP-1 = ZONETHRU DEC 31 (ALL)THRU DEC 31 (ALL)(1,24)(68)(1,24)(78)DESIGN-HEAT-T = 68DESIGN-COOL-T = 78HEAT-TEMP-SCH = H-SCHICOOL-TEMP-SCH = C-SCHITHERMOSTAT-TYPE = PROPORTIONALTHROTTLING-RANGE = 4Case 6PROPORTIONAL Heating/Cooling Thermostat Operation (withdeadband) and Off-Hour OffsetThis simulation, shown in Fig. IV.12, is as described for Case 5,except that off-hour temperature setback is provided for both heating andcooling.Input data necessary. for simulation of this mode of operation is:H-SCH2 = SCHEDULE THRU DEC 31(WD)(1,8)(60)(9,18)(68)(19,24)(60)(WEH)(1,24)(60)C-SCH2 = SCHEDULE THRU DEC 31(WD)(1,8)(85)(9,18)(78)(19,24)(85)(WEH)(1,24)(85)SP-2 = ZONE DESIGN-HEAT-T = 68DESIGN-COOL-T = 78HEAT-TEMP-SCH = H-SCH2COOL-TEMP-SCH = C-SCH2THERMOSTAT-TYPE = PROPORTIONALTHROTTLING-RANGE = 4 ..IV.168 (Revised 5/81)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!