12.07.2015 Views

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ES-B:LIFE-CYCLE BUILDING AND PLANT NON-ENERGY COSTS.This report summarizes life-cycle costs (other than for energy) for plantequipment and for each building component.FIRST COSTREPLACEMENTSOPERATIONSTOTALINVESTMENTis the initial purchase price, including installation.is the present value of the life-cycle replacement costs.is the present value of the life-cycle cost for annualmaintenance and major and minor overhauls.gives the sum of the previous three quantities.is the sum of the first two quantities, FIRST COST andREPLACEMENTS. Note that the investment does not includeoperations or energy costs.VII.126

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!