12.07.2015 Views

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

data to be plotted, resulting in a blank plot. This alsoresults in all data points appearing at the AXIS-MAX.AXIS-MINDIVIDEis a list of up to 2 values (one per axis) that specifythe minimum value on the horizontal (abscissa) axis. Thevalues are entered in the same order as the axes arenumbered. Care should be exercised in choosing thesevalues because it is possible to specify values above thedata to be plotted, resulting in a blank plot. This alsoresults in all data points appearing at the AXIS-MIN.is a list of values (one per variable in the VARIABLE-LISTinstruction) which scale the plot either up or down topresent the most readable plot. The variable values aredivided by these values.Example:AXIS-MAXAXIS-MINDIVIDEThe following keyword assignments,= 100= 0= 1000000would cause the value 5,000,000 to be plotted as 5 (1/20of the distance from 0 to 100). It is the user'sresponsibility to assign the proper AXIS-TITLES to matchthe DIVIDE value (i.e., GBTU).NOTE:The total number of VARIABLE-LIST variables in all REPORT-BLOCKinstructions must not exceed 60 in any sinVle HOURLY-REPORT.Also note that even if DAYLIGHT-SAVTNbS = ES, summer hours willnot reflect daylight saving time. Therefore, there will then bean hour difference between times in LOADS summary reports andhourly reports.For more information on HOURLY-REPORT see Chap. II.111.128 (Revised 5/81)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!