12.07.2015 Views

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

14. SYSTEMS-REPORTThe function of the SYSTEMS-REPORT instruction is to specify which of thestandard verification and summary reports are to be printed. The total of thecombined verification and summary reports must not exceed 200 for all zones,systems, and plants. Examples of these reports along with a description ofeach can be found in Chap. VII of this manual.The time period(s) covered in the SYSTEMS-REPORTs are the RUN-PERIODinterval(s), see RUN-PERIOD instruction, Chap. III Sec.B.2.SYSTEMS-REPORTVERIFICATIONSUMMARYCode-WordSV-AREPORT-ONLYinforms the SOL processor that the data to follow willidentify the standard reports that are to be printed. Thedata entry is the command word itself, no U-name identifieris required or permitted.Input for this keyword is the code-word list that identifiesif the standard verification report is to be printed. SeeTable IV.44 for the code-words and a description of thereport each represents.Input for this keyword is the code-word list that identifieswhich of the standard summary reports are to be printed. SeeTable IV.45 for the code-words and a description of thereport each represents. This entry can be omitted if only55-A, the default report, is des ired.TABLE IV.44VERIFICATION"System Design Parameters" prints out design parametersfor each SYSTEM and each ZONE-within-SYSTEM. Theseparameters are user-assigned and/or calculated by theprogram. System parameters include supply fan andreturn fan cfm, fan power consumption, and ducttemperature change. Also provided at the SYSTEM levelare outside air cfm, total cooling capacity, sensiblecooling capacity, COOLING-EIR, heating capacity,HEATING-EIR, and altitude multiplier. At the ZONE levelthe following are provided for each ZONE: supply andexhaust fan cfm and power consumption, MIN-CFM-RATIO,outside air cfm, total cooling capacity, sensiblecooling capacity, heat extraction rate, heatingcapacity, heating addition rate, and ZONE multiplier.Requested verification report is printed but the programdoes not proceed with the actual hour-by-hour simulation.If this code-word is specified, no PLANT simulation canbe requested following this SYSTEM input because noSYSTEM simulation is performed. This is a convenientway of getting only the equipment sizing informationwithout paying for a complete simulation.I V. 269 (Revised 5/81)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!