12.07.2015 Views

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Baseline data have been specified corresponding to a first-cost (includinginstallation) of ~63,000 and a present-value life-cycle replacement cost of~28,500. The present value of the annual operations costs for a 10-year projectlifetime range from ~10,100 in year 1 to $3300 in year 10. Similarly,the present value of the annual energy cost ranges from $84,300 for year 1 to~55,700 for year 10. The baseline annual energy use at the site is 10120 x106 Btu, and at the source is 20350 x 106 Btu.3. ECONOMICS-REPORTThe ECONOMICS program produces four output reports obtained by using theECONOMICS-REPORT instruction (abbreviated E-R). The reports available are.VERIFICATION (or V) =EV-ALife-cycle costing parameters and building component costinput data (default is EV-A)SUMMARY (or S) =ES-AES-BES-CAnnual energy and operations costs and savingsLife-cycle building and plant non-energy costsEnergy savings, investment statistics, and overall life-cyclecosts.ALL SUMMARY All the summary reports, ES-A, ES-B, and ES-C. (Default isES-A.)4. Other EDL CommandsEDL also accepts the following commands.TITLEDIAGNOSTICABORTENDPARAMETERPARAMETRIC-INPUTSET-DEFAULTINPUTCOMPUTEVI.12 (Revised 5/81)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!