12.07.2015 Views

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

REPORT PS-H - EQUIPMENT USE STATISTICSThis report gives the user an assessment of the appropriateness of theequipment selected.1) AVG OPER RATIO is the point, on the average, at which the equipmentoperates on its part load curve.2) MAX LOAO (MBTU) - MON-DAY-HR gives the maximum demand loading and thetime of occurrence. This value should compare favorably with the sizeof the equipment selected.3) SIZE (MBTU) is the equipment size selected either automatically by theprogram or as input by the user.4) OPER HRS is the total number of equipment-hours the equipment was "on."If more than one unit is involved there is space to report four moreunits by size and operating hours. If there are two pieces of equipmentof the same size, the value for OPER HRS is the sum of the number ofhours that each operates.VII.109

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!