12.07.2015 Views

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

REPORT SS-E - PLANT MONTHLY LOAD HOURSJust as the monthly load hours are reported for a HVAC system in ReportSS-C, the load hours for the plant named CONVENTIONAL are shown in ReportSS-E. Heating and electrical loads for the plant at the time of the coolingpeak are also reported.1. NUMBER OF COOLING LOAD HOURS and NUMBER OF HEATING LOAD HOURS. Thesehours, reported monthly, are the required operation hours of the centralplant for supplying heating or cooling to the HVAC systems served.2. CONCURRENT COOL-HEAT LOAD HOURS gives the number of hours in each monthwhen the central plant is operating with simultaneous heating and coolingload s.3. HEATING LOAD AT TIME OF COOLING PEAK and ELECTRICAL LOAD AT TIME OFCOOLING PEAK are self-explanatory.VII.65

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!