12.07.2015 Views

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

REPORT PS-J - PLANT LIFE-CYCLE COST SUMMARYThe upper portion of this report gives the following quantities:FIRST COST (INCLUDING INSTALLATION) is the total initial purchase priceof all the plant equipment, including the cost of installation.REPLACEMENTS is the present value of the life-cycle plant replacementcosts.ENERGYis the present value of the life-cycle energy cost.OPERATIONS is the present value of the life-cycle operations cost.TOTAL is the sum of the previous four numbers.The next portion of the report gives the annual energy use, in106 Btu, at the site and at the source.The final portion gives the present value of the energy and operationscost for each year of the project lifetime.VII.113

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!