12.07.2015 Views

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

LOADS HOURLY REPORT PLOTThe following example is an HOURLY-REPORT in graphic form. The month,day, and hours appear in the left-hand column. The next enter to the right isthe first possible value. If this character is a period (.) this indicates novalue at or below this value and if it is an asterisk (*) this indicates thattwo or more values occupy this position. The numerical values appearing onthe plot are correlated to the symbol numbers in the table above the plot.Component name, in the table, is the VARIABLE-TYPE of which the variable is apart. If a value appears at the last possible position on the right it meanseither that the value is at this point or that the value is higher than thispoint.The original input that created the following sample plot is repeated herePLOTER1 = REPORT-BLOCKVARIABLE-TYPE = GLOBALVARIABLE-LIST = (4,21)PLOTER2 = REPORT-BLOCKVARIABLE-TYPE = BUILDINGVARIABLE-LIST = (1,18)PLOTD~DB~HEATING= HOURLY-REPORTREPORT-SCHEDULE = PLTSCHREPORT-BLOCK = (PLOTER1, PLOTER2)OPTI ONPLOTAXIS-ASSIGN = (1,1,2,2)AXIS-TITLES = (*DBT-F---DR-SOL*,*HEAT-COOL LOADS*)AXIS-MAX = (200, 40000)AXIS-MIN (0, 0)DIVIDE = (1,1,-1,-1)TEMP AND DIR SOLAR$AND COOLING LOAD$For more information on specifying this type of report see HOURLY-REPORTin Chap. III.VI 1.48

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!