12.07.2015 Views

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

LOAD-MANAGEMENT or L-MKeyword Abbrev. User Input(User Worksheet)InputRangeDesc. Default Min. Max.HEAT -MUL TIPLI ER H-M = number O. O.COOL-MULTIPLIER C-M = number O. O.ELEC-MULTIPLIER E-M number l. O.PRED-LOAD-RANGE PRED-L-R= 106 Btu/hr * O.ASSIGN-SCHEDULE A-SCH= list ofU-names**LOAD-ASSIGNMENT L-A 1 i st ofU-names**PRED-LOAD-RANGE PRED-L-R= 106Btu/hr * O.ASSIGN-SCHEDULE A-SCH= list ofU-names**LOAD-ASSIGNMENT L-A = 1 i st ofU-names**PRED-LOAD-RANGE PRED-L-R= 10 6 Btu/hr * O.ASSIGN-SCHEDULE A-SCH= list ofU-names**LOAD-ASS IGNMENT L-A list ofU-names**10.10.10.1000.1000.1000.* This is a required data entry.** The list of U-names should be ordered as follows: the assignment forheating first, cooling next, and electric last. The list need notassign cooling or electric equipment if only the heating load isbeing managed. However, the list must assign the heating and coolingequipment if the cooling load is managed, or the heating, cooling andelectric generating equipment if the electric load is managed.V.65 (Revi sed 5/81)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!