12.07.2015 Views

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

DOE-2 Reference Manual Version 2.1 - DOE2.com

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

In ECONOMICS SimulatorINPUT ECONOMICS ..ADD-BOILEREND .•COMPUTE ECONor'i1 CSSTOP ..ECONOMICS-REPORT; COMPONENT-COSTBASELINESUMMARY; (ALL-SUMMARY)FIRST-COST; 3000INSTALL-COST; 600ANNUAL-COST ; 300COMPONENT-LIFE; 10FIRST-COST; ...• etc.3. Method III: Comparison of New Building Designs Using InvestmentStatistics.A. Procedure.1. Run <strong>DOE</strong>-2, including ECONOMICS, on the alternative with thesmallest investment. This is the baseline run.2. Run <strong>DOE</strong>-2 on each of the remaining alternatives, using theresults of 1 above, to obtain the appropriate input for theBASELINE instruction (see Table VI.2).3. The investment statistics that determine whether thealternative is cost-beneficial, relative to the design withthe smallest investment, are given in ECONOMICS Report ES-C.: u.s. GOVERNMENT PRINTING OFFICE: 1982 -0- 374-544 V 1.16 (Revi sed 5/81)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!