05.03.2013 Views

E5CNH E5AN-H E5EN-H Digital Controllers User's Manual - OMRON

E5CNH E5AN-H E5EN-H Digital Controllers User's Manual - OMRON

E5CNH E5AN-H E5EN-H Digital Controllers User's Manual - OMRON

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Using the Simple Program Function Section 4-16<br />

Initial Setting Level 3. Use the U Key to set the parameter to STOP.<br />

140<br />

ptrn<br />

off<br />

ptrn<br />

stop<br />

pbnk 7<br />

pbnk 2<br />

4. Press the M Key to select the Valid Program Bank parameter.<br />

5. Use the U and D Keys to set 2.<br />

6. Press the O Key for at least one second to move from the initial setting<br />

level to the operation level.<br />

Operation Level 7. Press the O Key to move from the operation level to the bank setting lev-<br />

C<br />

PV/SP<br />

el.<br />

25.0<br />

100.0<br />

Program Pattern<br />

Bank setting level 8. The Display Bank Selection parameter will be displayed. The current<br />

Display Bank<br />

Selection<br />

bank number will be displayed, so use the U and D Keys to select 0.<br />

d.bnk 0<br />

d.bnk 0<br />

0.lsp<br />

0.0<br />

0.lsp<br />

150.0<br />

0.sok 1<br />

0.sok 5<br />

Bank 0 SP<br />

Bank 0<br />

Soak Time<br />

Bank 0<br />

0.wtb Wait band<br />

off<br />

0.wtb<br />

3.0<br />

9. Press the M Key to select the Bank 0 SP parameter.<br />

10. Use the U and D Keys to set the parameter to 150.0.<br />

11. Press the M Key to select the Bank 0 Soak Time parameter.<br />

12. Use the U and D Keys to set the parameter to 5.<br />

13. Press the M Key to select the Bank 0 Wait band parameter.<br />

14. Use the U and D Keys to set the parameter to 3.0.<br />

15. Press the M Key to select the Display Bank Selection parameter.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!