12.11.2012 Views

TQM Model of Elements-Deployment Table Developed from Quality ...

TQM Model of Elements-Deployment Table Developed from Quality ...

TQM Model of Elements-Deployment Table Developed from Quality ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

global competitiveness and management innovations by self-assessment through<br />

<strong>Quality</strong> Award implementation <strong>of</strong> the enterprise in this research. It is the one to expect<br />

to emphasize a social necessity <strong>of</strong> the utilization <strong>of</strong> this, to contribute to the formation <strong>of</strong><br />

the quality culture <strong>of</strong> our country consequently, to learn to <strong>Quality</strong> Award in each<br />

country, and to be going to deepen in addition by the cooperation <strong>of</strong> industry and<br />

academy in the future.<br />

This academic dissertation is structured as follows.<br />

Chapter 2 is explained for our historical details in the <strong>TQM</strong> development <strong>of</strong> Japan,<br />

and the role especially indicated <strong>of</strong> Deming Prize played are the descriptions the author<br />

based on the document that is reviewed, and what clarify the past and the current state<br />

concerning <strong>TQM</strong> and <strong>Quality</strong> Award that is the research object <strong>of</strong> this academic<br />

dissertation. Especially, it was clarified for <strong>Quality</strong> Award not to stay in a mere accolade<br />

system, to act in shape <strong>of</strong> <strong>Quality</strong> Award that indicated the <strong>TQM</strong> element, and to have<br />

pulled <strong>TQM</strong> activities and economic development for the entire nation consequently,<br />

and clarified importance in the <strong>TQM</strong> research that is research object <strong>of</strong> this thesis in<br />

Chapter 2. This thesis is developed based on the perception about the present state <strong>of</strong><br />

affairs developed in Chapter 1 and Chapter 2.<br />

In Chapter 3, the detailed study for processing <strong>of</strong> international development <strong>of</strong> the<br />

<strong>Quality</strong> Award that is the main research objectives <strong>of</strong> this thesis.<br />

In Chapter 4, the development <strong>of</strong> the new methodology <strong>of</strong> the <strong>TQM</strong> element deployment<br />

based on the evaluation criteria <strong>of</strong> each award is developed for the sake <strong>of</strong> comparison<br />

objectively <strong>Quality</strong> Award in each country by QFD technique (<strong>Quality</strong> Function<br />

<strong>Deployment</strong>: QFD). The methodology is developed further, and Each Award is<br />

quantitatively compared based on the multivariate analysis (Principal Factor Analysis<br />

etc.), and the feature <strong>of</strong> each Award is clarified in Chapter 5. And then, in Chapter 6, the<br />

effectiveness <strong>of</strong> the development technique is verified based on the comparison<br />

evaluation doing the transition <strong>of</strong> the time series <strong>of</strong> the evaluation criteria <strong>of</strong> the quality<br />

award by the technique for developing in Chapter 4 and Chapter 5.<br />

In Chapter 7 continuously, it is examined the AISIN Co., Ltd. group in detail as a case<br />

about the role <strong>of</strong> the Deming Prize accomplished to the process <strong>of</strong> the <strong>TQM</strong> introduction,<br />

clarifies the relation between a standard process and the Deming Prize <strong>of</strong> the <strong>TQM</strong><br />

introduction, and explains "Management at which <strong>TQM</strong> aims" adding consideration<br />

<strong>from</strong> the viewpoint <strong>of</strong> 11 factors extracted in Chapter 5. In Chapter 8, the feature <strong>of</strong> the<br />

Cross-Functional Management was clarified by using the Cross-Management Factor <strong>of</strong><br />

<strong>TQM</strong> that was the factor only <strong>of</strong> the Deming Prize extracted in Chapter 5.<br />

2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!