12.11.2012 Views

TQM Model of Elements-Deployment Table Developed from Quality ...

TQM Model of Elements-Deployment Table Developed from Quality ...

TQM Model of Elements-Deployment Table Developed from Quality ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>TQM</strong> (illustration)" as a common standard was prepared <strong>from</strong> Passage <strong>of</strong> <strong>TQM</strong><br />

activities <strong>of</strong> process <strong>of</strong> <strong>TQM</strong> development <strong>of</strong> Japan and AISIN Co., Ltd. and the<br />

footprint <strong>of</strong> the Deming prize recipient enterprises and proposed reference <strong>of</strong> the<br />

introduction and the promotion <strong>of</strong> <strong>TQM</strong> in the enterprise. This step may try the vision<br />

management <strong>from</strong> the beginning rather than order by the one to show the level. It is<br />

thought that it becomes reference <strong>of</strong> Self Assessment in the stage <strong>of</strong> the advancement<br />

<strong>of</strong> its own <strong>TQM</strong> at the level such as Fig. 7.2.<br />

The step <strong>of</strong> the introduction and the promotion was brought together as follows,<br />

and it related it to 11 factors <strong>of</strong> Chapter 5 (Yoji Akao, Kozo Koura [5]).<br />

Step 0: Motive and trigger (Leader philosophy)<br />

Step 1: Preparation for <strong>TQM</strong> Introduction (Leader philosophy and management<br />

responsibility)<br />

Step 2: Construction <strong>of</strong> <strong>TQM</strong> Promotion System (Management responsibility and<br />

human resources development)<br />

Step 3: Establishment <strong>of</strong> Division Management System (Customer market and<br />

process)<br />

Step 4: Establishment <strong>of</strong> Total Management System (Customer and market,<br />

cross-management, and information utilization)<br />

Step 5: Enhancement and strengthening <strong>of</strong> Total Management System (Social<br />

responsibility and partner)<br />

Sstep 6: Establishment <strong>of</strong> Strategic <strong>TQM</strong> Systems (Strategic plan)<br />

Step 7: Establishment <strong>of</strong> Vision Management System (Revolutionary innovation)<br />

Step 8: Establishment <strong>of</strong> Global QM System (Revolutionary innovation)<br />

Step 9: Enterprise-creating toward futur that is trusted and respected in the world<br />

Note: It is necessary to introduce Revolutionary Innovation factor gradually<br />

depending on degree <strong>of</strong> advancement after Step 4.<br />

Next, it explains in detail by steps.<br />

Step 0: Motive and Trigger<br />

In the enterprise, it could be found various motives to introduce <strong>of</strong> <strong>TQM</strong> is determined.<br />

When enumerating it,<br />

(1) A severe economic emvironment like the recession etc. is forecast and overcome.<br />

(2) <strong>TQM</strong> introduction by competitive enterprise<br />

(3) Recommendation by parent enterprise<br />

(4) Recognition for necessity <strong>of</strong> breakthrough <strong>of</strong> its company by top management.<br />

(5) Establishment <strong>of</strong> successor system<br />

(6) Establishment <strong>of</strong> vision management<br />

200

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!