department become secretariat though management form is object <strong>of</strong> Q (<strong>Quality</strong>), C<br />

(Cost/ Pr<strong>of</strong>it), and D (Quantity/ Delivery Date) as main functions. This committee<br />

selects, adopts company-wide cross-functional problems, and establish the<br />

cross-functional improvement plan. The execution <strong>of</strong> the content is by line department.<br />

And, the execution result is checked by the report <strong>from</strong> the line and the<br />

cross-functional diagnosis (audit). Moreover, the installation <strong>of</strong> a necessary<br />

cross-functional committee is planned in General Planning Office that is under<br />

immediate control by top. Cross-Functional Team (CFT) is organized and deals for the<br />

cross division problem at each committee.<br />

8.5.3 Product Management (Strategic Business Unit Management)<br />

Product Management: SBU (Strategic Business Unit) Management is "Matrix<br />

systematic management to which product concerned proper problem is treated by<br />

division manager concerned (SBU Chief) command in each product project" (JSQC<br />

Policy Management Case Study Committee [18]). Because the activity becomes a center<br />

in continuous daily operation for project, the point to need the person in charge <strong>of</strong><br />

working full-time as a rule is different <strong>from</strong> the Cross-Functional Management.<br />

8.5.4 Project Management<br />

"Business handled as enterprise project in distinction <strong>from</strong> regular business"<br />

(1) New business creation project<br />

(2) New product, new technology, and new maket development project<br />

(3) Large-scale purchase (plant order etc.) project<br />

(4) Large-scale investment project<br />

(5) Emphatic business improvement project<br />

(6) Reaponding to environmental change project<br />

The project executive (project manager) is specifically ssigned till being solved the<br />

Problem and finished, after that, dissolved that temporary based team activity (JSQC,<br />

Policy Management Case Study Committee [18]).<br />

8.5.5 Relqation between Division Management, Cross-Functional Management, Product<br />

Management, and Policy Management and Daily Managment<br />

It is preferable that the system improvement in the Cross-Functional<br />

Management is proceeding by the Policy Management. In that case, the cross-functional<br />

policy is established prior to division policy, then based on this, further built into the<br />

division policy, and it is executed as described in "Para. 8.4.3 Excutive Procedure by<br />

Policy Management System". The result <strong>of</strong> improvement is standardized, and the Job<br />

Description is made and the cross-functional business is accomplished in the Daily<br />

Management. The relation described above was shown in <strong>Table</strong> 8.4. ◎ is to mean it is<br />