TQM Model of Elements-Deployment Table Developed from Quality ...
TQM Model of Elements-Deployment Table Developed from Quality ...
TQM Model of Elements-Deployment Table Developed from Quality ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Table</strong> 8.9 Main Problem before Introduction <strong>of</strong> Cross-Functional Management (1960-1990), 102 companies<br />
Division Step<br />
Problem<br />
Common Cooperation between divisions is weak. 30<br />
General<br />
All company quality assurance system corresponding to the market<br />
and the customer needs is incomplete.<br />
17<br />
Project<br />
Grasp <strong>of</strong> demanded quality, collection <strong>of</strong> market quality information is<br />
insufficient .<br />
25<br />
Design/ trial Outflow <strong>of</strong> problem <strong>of</strong> design and experimental stage to post-process 16<br />
Production Outflow <strong>of</strong> problem <strong>of</strong> production preparation stage to post-process 20<br />
<strong>Quality</strong><br />
There are a lot <strong>of</strong> defective in processes. 22<br />
assurance<br />
Manufacturing<br />
Defective unprevention and recorrance prevention activity that holds<br />
factor system is insufficient.<br />
20<br />
<strong>Quality</strong> assurance is an inspection oriented principle. 18<br />
Built-in quality in process is weak. 16<br />
There are a lot <strong>of</strong> complaints and a quality troubles. 26<br />
Sales service There are a lot <strong>of</strong> emergency measures, and claim management's<br />
correspondence is slow.<br />
16<br />
Management system<br />
Cost/ pr<strong>of</strong>it<br />
management Improvement activity<br />
Cost project is insufficient.<br />
Scientific all company pr<strong>of</strong>its and cost improvement activities are<br />
insufficient.<br />
14<br />
14<br />
Amount/ Production plan<br />
delivery date process organization<br />
Lloss by the process complication increases. 11<br />
management Stock Amount <strong>of</strong> stock increases. 11<br />
Project power and<br />
technology<br />
Advanced technology shortage corresponding to new field 17<br />
New product Product strategy and<br />
development information gathering<br />
Search, collection, and report <strong>of</strong> product planning information like<br />
market, customer, and technology, etc. are insufficient.<br />
15<br />
Development period<br />
and prior study<br />
Outflow <strong>of</strong> problem <strong>of</strong> project and development stage to post-process<br />
by insufficiency<strong>of</strong> prior measures<br />
15<br />
Retail Use <strong>of</strong> information<br />
management<br />
Business posture<br />
Collection, analysis, and use <strong>of</strong> market and customer information are<br />
insufficient.<br />
Mid/long-term business strategy is lacked.<br />
13<br />
11<br />
Safety/<br />
healthcare<br />
management<br />
Safety healthcare management activity and system are insufficient.<br />
There are a lot <strong>of</strong> industrial injuries.<br />
6<br />
4<br />
Remarks<br />
The figure <strong>of</strong> each column is a problem number. Because the cooperation between divisions<br />
appeared at each division, they are put in "Common".<br />
(D) Effects after introduces it<br />
The effects after it introduced it was classified into 1084 <strong>of</strong> a total sum under<br />
99 categories. Because commonness and quality assurance, especially "Cooperation<br />
between divisions strengthens" appeared at each function division, <strong>Table</strong> 8.10 is put in<br />
"Common" as a total sum. <strong>Table</strong> 8.11 is various functions <strong>of</strong>, that is, Cost and Pr<strong>of</strong>it<br />
Management, Quantity and Delivery Date Management, New Product Development,<br />
Sales Management, and Safety and Healthcare Management excluding Common and<br />
<strong>Quality</strong> Assurance.<br />
And, the main effect in them was shown in <strong>Table</strong> 8.12.<br />
246