12.11.2012 Views

TQM Model of Elements-Deployment Table Developed from Quality ...

TQM Model of Elements-Deployment Table Developed from Quality ...

TQM Model of Elements-Deployment Table Developed from Quality ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(1) All mutual agreement is obtained “All company formation is arranged as<br />

system-design by thinking only pure function without prejudicing to current<br />

organization structure”.<br />

(2) The method <strong>of</strong> evaluating the purpose and the result <strong>of</strong> each function is<br />

established. It obtains consensus about various activities necessary for target<br />

achievement.<br />

(3) Various activities necessary for existing organizational constitution for target<br />

achievement are allocated. The organization change is done when is necessary.<br />

(4) A top decision making mechanism is renewed to the functional one as much as<br />

possible.<br />

8.4.3 Implementation Procedure by Policy Management System<br />

The Cross-Functional Management is implemented through Policy Management<br />

System. The step <strong>of</strong> the implementation procedure is described as follows.<br />

(1) To establish for company-wide fundamental objectives<br />

(2) To establish for cross-functional target and the means (execution matter) in the<br />

Cross-Functional Management Committee and the Cross-Functional Division for<br />

accomplishment <strong>of</strong> basic objectives.<br />

(3) To allocate cross-functional target and means in to line division target and<br />

execution matter and integrated adjustments (print match).<br />

(4) To establish for line division target and inplementation matter in<br />

Cross-Functional Management.<br />

(5) To deploy target and execution matter to each part, section, and unit in charge.<br />

At this stage, Cross-Functional Management working team is organized and<br />

target and implementation matter <strong>of</strong> project are established.<br />

(6) To set up Management Items and targets in the hierarchical each position <strong>of</strong> (1) -<br />

(5) at the same time <strong>of</strong> target deployment<br />

(7) To implement cross-functional target and implementation matter put in during<br />

line division policy deployment<br />

(8) To evaluates achievement situation <strong>of</strong> company-wide cross-functional target and<br />

executing situation <strong>of</strong> implementation matter after consodated summerization <strong>of</strong><br />

executed process performance, and then feed back it to the next year planning by<br />

Cross-Functional Division.<br />

(9) To conduct periodic cross-functional diagnosis <strong>of</strong> cross-functional target and<br />

implementation matter in each line department under company-wide standpoint<br />

once or more a year, to check Cross-Functional Management System, and to take<br />

necessary action by each Cross-Functional Committee.<br />

8.4.4 Procedure <strong>of</strong> Cross-Functional Management <strong>Deployment</strong><br />

The Cross-Functional Management Committee subsystem develops<br />

228

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!