12.11.2012 Views

TQM Model of Elements-Deployment Table Developed from Quality ...

TQM Model of Elements-Deployment Table Developed from Quality ...

TQM Model of Elements-Deployment Table Developed from Quality ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

information management (IT; information technology) etc.<br />

(6) Introduction <strong>of</strong> Division Manager <strong>TQM</strong> Diagnosis<br />

It is a time to fully structure <strong>of</strong> <strong>TQM</strong> System, and also integration with ISO<br />

9000/ 14000 would be necessary to consider.<br />

It is possible to aply Deming Prize at this step.<br />

Step 5: Enhancement and strengthening <strong>of</strong> Total Management System<br />

(1) Enhancement <strong>of</strong> quality assurance system by project development <strong>of</strong> new field<br />

commodity<br />

(2) Enhancement and strengthening <strong>of</strong> Policy Management<br />

(3) Enhancement and strengthening <strong>of</strong> Cross-Business-Element Management<br />

(4) Introduction <strong>of</strong> Relationship Management<br />

(Note) Relationship Management: Management that measure, considers and<br />

evaluate for good or badness relations <strong>of</strong> "Excellent Relationship" between<br />

customer, employee, society, bisiness relation, and stockholder (reference to<br />

4.3.2 Comparison <strong>of</strong> Criterias: (4) framework, Fig. 4.4 View points <strong>of</strong><br />

examination in 2001 Deming Application Prize)<br />

(5) Introduction <strong>of</strong> Product Management and Project Management etc.<br />

(6) Introduction <strong>of</strong> GWQM (Group-Wide <strong>Quality</strong> Management)<br />

(7) Introduction <strong>of</strong> Cross-Business-Element Management Diagnosis<br />

It is possible to start own <strong>TQM</strong> at this step.<br />

Step 6: Establishment <strong>of</strong> Strategic <strong>TQM</strong> System<br />

(1) Establishment <strong>of</strong> quality assurance system by commodity classification at project<br />

planning and development stages<br />

(2) Establishment <strong>of</strong> Total Commodity Strategic System<br />

(3) Expansion to GLQM (Global <strong>Quality</strong> Management)<br />

It is possible to apply to JQM after 5 years <strong>of</strong> Deming Prize recipient.<br />

Step 7: Establishment <strong>of</strong> Vision Managements System<br />

(1) Introduction <strong>of</strong> Vision Management<br />

(2) Clarificating <strong>of</strong> creed, ethics, vision, mission, and value<br />

(3) Fostering for corporate culture<br />

(4) Structuring for Vision and Strategy Draft Discussion System <strong>of</strong> by Directors GD<br />

(5) Establishment <strong>of</strong> Vision Management System<br />

204

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!