The Activate View command activates a viewport on the sheet, allowing you to edit the model<br />

directly from the sheet.<br />

3 On the Drafting tab of the Design Bar, click Tag ➤ Tag By Category.<br />

4 On the Options Bar, clear Leader.<br />

5 In the drawing area, position the cursor just outside the revision cloud for grid line B.<br />

If the cursor is just inside the cloud, the tag is displayed inside the cloud.<br />

6 Click to place the tag.<br />

The tag displays the revision number of the cloud. The number is based on the numbering<br />

method you specified when you set up the revision table. Because you chose to number by sheet,<br />

and because the revision is the first in the project, the cloud is tagged as number 1.<br />

7 Repeat steps 2 through 5 to add revision tags for all remaining revision clouds.<br />

8 Click File menu ➤ Save.<br />

Working with Revisions<br />

9 Proceed to the next exercise, Working with Revisions on page 447.<br />

In this exercise, you first view the revisions that were created in the previous exercise, and then issue the<br />

revisions to create a record, and lock it from further changes.<br />

NOTE This exercise requires the completion of the previous exercise. Use the project file that you saved at the<br />

end of that exercise, m_RST_Revision-in progress.rvt.<br />

View the revisions<br />

1 In the Project Browser, under Sheets (all), double-click S.1 - Level 3 Framing Plan.<br />

2 Select , and draw a zoom box around the title block as shown.<br />

Working with Revisions | 447